Notes on installation and debugging of sintering machine
2023-12-15 15:10:01

During the installation and debugging process of the sintering machine, attention should be paid to the following issues:

Construction site preparation: The construction site needs to be flat and clean to ensure smooth installation and commissioning. The debris in the construction area should be cleared, and the weeds and dust on the site land should be removed. Check if there is enough space on the construction site to accommodate the sintering machine and its accessories. Check if the power supply meets the requirements, and if the power socket and wiring are normal.

Install the sintering machine body

Carefully read the installation manual of the sintering machine to understand the installation requirements and steps of the sintering machine.

According to the drawings and installation instructions provided by the manufacturer, accurately install all components of the sintering machine to ensure proper installation.

Pay attention to the installation position of the sintering machine, make it easy to connect with relevant equipment, and reserve sufficient space for maintenance and repair.

Connecting conveyor equipment

The sintering machine needs to be connected to conveying equipment, such as feeders, conveyor belts, etc. When connecting conveyor equipment, ensure that the connection is firm and stable, and avoid jumping and shaking.

Ensure that the size of the interface between the conveying equipment and the sintering machine meets the requirements, and avoid material leakage or jamming.

Install sintering machine accessories, including various signal lines, pipelines, cables, etc. During the installation of accessories, the following points should be noted:

Carefully read the installation instructions to ensure proper connection of each signal line and pipeline.

Ensure that the length and position of signal lines and pipelines are appropriate to avoid excessive or insufficient tension.

Mark and classify each signal line and pipeline for easy positioning during maintenance and repair.

Carefully inspect the installation

After installation, it is necessary to carefully inspect the sintering machine to ensure that each component is installed correctly and firmly fixed.

Check if each pipeline is sealed and if there is any leakage.

Check if each cable and signal wire are securely connected and there are no issues such as breakage or short circuits.

Before starting the sintering machine, some preparation work needs to be done:

Clean the dust and dirt from the sintering machine body and accessories.

Fully lubricate all transmission components to ensure smooth operation.

Check if the power supply and control system of the sintering machine are normal and if there are any abnormal phenomena.

Startup and debugging

Before starting the sintering machine, it is necessary to inspect all safety protection devices and equipment to ensure safe operation.

After starting the sintering machine, a trial run is required to observe the operation of various indicator lights and instruments to ensure normal operation.

During the trial operation, adjust and monitor the various parameters of the sintering machine to ensure that it operates at its optimal state.

Testing and debugging

After successful trial operation, relevant tests and debugging, such as temperature testing, equipment load testing, etc., need to be carried out.

Check the overall working effect and quality of the sintering machine to ensure compliance with relevant requirements.

In short, during the installation and debugging process of the sintering machine, it is necessary to strictly follow the installation instructions provided by the manufacturer to ensure the correctness of each step. At the same time, pay attention to details to ensure the firmness and sealing of each connection point. During the startup and debugging process, attention should be paid to safety, and corresponding tests and adjustments should be carried out to ensure the normal operation of the sintering machine.


Customer service hotline

400-1760-789

Tangshan Bohai Metallurgical (Group) Co., Ltd., China

Address:No. 11 Kaisan Road, High tech Industrial Park, Tangshan City, Hebei Province, China

Postal Code: 063020

Contact number:+86-315-5923161/5923167

Fax:+86 315 5934590

Website:http://www.tsbyjt.com

E-mail: tsbhyj@126.com